Case Study

6 Gates Avenue

Bringing a Vacant 1920s Building Back to Life Without Erasing What Made It Special

A vacant building from the 1920s. A Montclair market hungry for modern office space. One development team saw both at the same time.

01

LOCATION

6-8 Gates Ave, Montclair, NJ

CLIENT

Joint Venture – Becker Organization, Greenwood Development, Deugen Development & Construction

02

TIMELINE

Approximately 1 year

03

TYPE

Historic Renovation & Mixed-Use Adaptive Reuse

04

TOP RESULTS: 

  • Vacant early 1900s heavy timber and brick building converted into fully operational mixed-use space
  • Third and fourth floor private offices fully leased at delivery
  • Building now 99% leased across retail and office
  • Designated historic building by the Montclair Preservation Society

6 Gate Avenue had been sitting vacant for years.

The original building dated back to the early 1900s and was built with heavy timber, solid brick, and the kind of industrial character that is difficult to recreate. It had once been used for wine and goods storage, but by the time the project began, the building needed a serious reset.

And while the bones were remarkable, the condition wasn’t.

Deugen Development & Construction entered the project as both co-developer and general contractor alongside the Becker Organization and Greenwood Development. The goal was not to flatten the site and replace it with a standard office build.

The goal was to preserve what made the building valuable, remove what no longer worked, and turn the property into a modern mixed-use destination for Montclair NJ’s office and retail market.

TOTAL BUILT AREA
0 SF
PROJECT VALUE
$ 0 M

THE CHALLENGES

Working on a building from the early 1900s meant inheriting a century of decisions we didn’t make, and couldn’t clearly undo.

The structure was designated historic by the Montclair Preservation Society, which meant the facade couldn’t be altered, specific window types were required, and the building’s solid brick walls and massive timber beams had to be worked around rather than through.

However, the most significant challenge was mechanical.

In a new building, ductwork and electrical conduit run through cavities in walls and ceilings. In a solid brick building, those cavities don’t exist, and cutting large openings through load-bearing brick calls to create them wasn’t structurally or historically viable. That meant every mechanical system had to be rethought from the ground up.

The site added another layer of difficulty. With zero lot lines on three sides, facade work required access coordination with neighboring property owners throughout construction.

This wasn’t a project where every problem could be solved before work began. Many of the constraints had to be managed in real time.

THE PROCESS

Demolishing the Addition and Rebuilding
The 1970s addition had deteriorated beyond saving, so Deugen brought it to the ground and rebuilt it as a new four-story structure alongside the existing building – matching the scale and character of a century-old structure while meeting current code requirements.

Designing Around Mechanical Constraint
Rather than treating the building’s limitations as obstacles, Deugen leaned into them as design opportunities. Exposed spiral ductwork was specified throughout, turning a mechanical necessity into a feature that reinforced the building’s industrial character. Hard EMT conduit ran visibly along the brick walls, and the existing brick was cleaned, preserved, and sealed to remain exposed on the interior.

For the second-floor co-working offices, conventional HVAC would have required cutting large openings through the brick, something the structure couldn’t accommodate. Instead, Deugen sourced Ephoca PTAC units imported from Italy, requiring only two small core holes rather than a standard large wall opening.

Reinforcing the Heavy Timber
The original heavy timber beams were reinforced with gusset plates and kept in place rather than replaced, a decision that was as much about design as preservation. The exposed timber became one of the defining features of the space and a major part of what drew tenants to the building.

Converting to Mixed-Use
The ground floor became retail, now home to an MMA gym and Drip Fitness. The second floor was built out as a co-working space with 20 office pods and shared amenities. The third and fourth floors became private offices, with both floors delivered fully leased at completion.

THE RESULTS

6 Gates Avenue went from a vacant, deteriorating building to one of Montclair’s more distinctive mixed-use addresses.

The finished project delivered 24,000 SF of office and retail space in a building that kept its historic character while meeting modern tenant expectations.

The third and fourth floors were fully leased at delivery, and the building has since reached 99% occupancy across retail and office, showing that the market responded to the product.

The exterior Jerkface mural also became part of the property’s identity, giving the building a stronger presence in the neighborhood and helping it stand out in downtown Montclair.

Timeline

Approximately 1 Year

Project Value

$8 Million Total
$2.5 Million Construction

WHAT ADAPTIVE REUSE ACTUALLY REQUIRES

Most NJ developers look at a vacant historic building and see risk.

Preservation requirements. Unknown field conditions. Structural limitations. Mechanical constraints. Neighboring properties. Approval requirements. Existing materials that cannot simply be replaced with something easier.

6 Gates Avenue had all of that.

But those same constraints are also what gave the finished building its character.

The solid brick walls that made mechanical routing harder became a major design feature. The heavy timber beams that required reinforcement became one of the most memorable parts of the interior. The decision to preserve the facade helped the project stay connected to the history of Montclair instead of replacing it with another standard NJ commercial building.

Adaptive reuse works when the project team understands what is worth keeping and knows how to build around it.

Project Gallery

Conclusion

The 6 Gates Avenue project demonstrates that the harder path – preservation over demolition, design over demolition, problem-solving over standard playbooks – produces buildings that markets actually want to be in.

Deugen came in as developer and general contractor on a project that most would have torn down, delivered a mixed-use building that Montclair’s tenants responded to immediately, and left a block in downtown Montclair permanently better than they found it.

Planning a historic renovation or adaptive reuse project in New Jersey? Work with a developer and contractor who knows how to preserve what’s worth keeping.

 