Joyce Kilmer logistics Center
Class-A Industrial Development Partnership
Unanimous planning board approval in June 2024
Location
705 Joyce Kilmer Avenue
New Brunswick
ROLE
Class-A Industrial Development Partnership
TIME
Construction SEP 2025 Anticipated Delivery: Nov 2026
$0.00
Change Orders
Zero Surprises
Designed to meet strong Exit 9 demand for modern industrial facilities under 100,000 SF
Flexible layout for up to four tenants
Built around institutional-grade specs in a supply-constrained submarket
The Challenges
Exit 9 is one of the strongest industrial locations in New Jersey. With direct access to the NJ Turnpike and Route 18, it serves as a critical transportation hub for businesses moving goods throughout the Northeast.
The challenge was transforming an obsolete industrial facility into a modern Class-A warehouse while preserving operational efficiency and meeting strict development timelines.
There was also strong demand from tenants seeking high-quality industrial space in a market with limited availability. The project needed to deliver flexibility, functionality, and long-term value.
Rather than forcing tenants into oversized facilities, the development was designed to serve an underserved segment of the market: businesses seeking Class-A industrial space under 100,000 SF, with modern specifications and the flexibility to accommodate their operational needs.
The Process
Faropoint came into the project after we’d secured entitlements, but from that point forward it became a true partnership. Deugen had identified the opportunity and navigated the approval process, establishing the foundation for an institutional development partnership.
Assembling the Team and Securing Approvals
We put together a team that understands how New Brunswick works:
- Thomas Kelso from Kelso Burgess handled land use
- James Henry and Justin Taylor from Dynamic Engineering managed civil and traffic engineering
- Kate Keller from Phillips Preiss Grygiel Leheny Hughes led planning
The application addressed every concern upfront, and in June 2024, the board approved the project unanimously. No delays and no conditions that would’ve added costs or pushed timelines.
Designing for Market Needs
Brian M. Taylor and Stacy Mulrain from Taylor Architecture designed two buildings– 109,799 SF and 85,622 SF – organized around a central truck court. This layout keeps loading docks out of sight while making truck movement efficient and safe for drivers.
Key specifications:
36-foot clear height for modern racking
32 loading positions across both buildings. 15,000 SF of office space
Flexible layout accommodating up to four separate tenants
97 parking spaces, including eight with EV charging spaces
Making the Site Work
Dynamic Engineering integrated bioretention basins into the site design for stormwater management from the beginning.
The entrance aligns with an existing intersection to support smoother truck access, and the turning radius was designed to help trucks move in and out safely.
The architecture is clean and functional, with precast concrete in three shades of gray, natural light throughout, and curtainwall glazing at entries. It is a stronger product than the typical warehouse box without trying to be something it’s not.
“Our longstanding presence in the New Jersey market, combined with Faropoint’s innovative approach to industrial real estate and proven ability to execute, creates a powerful partnership. The Joyce Kilmer Logistics Center represents the type of strategic development that leverages both companies’ strengths to deliver a product that meets the evolving needs of today’s industrial users.”
Eric Gormeley, CEO, Deugen Development
The Results
What The Project Delivers
With completion anticipated in November 2026, Joyce Kilmer Logistics Center is nearing delivery of 195,421 SF of Class-A industrial space across two buildings in New Brunswick, New Jersey.
Designed with modern specifications and flexible layouts, the development will accommodate a range of industrial tenants seeking high-quality space in the Exit 9 market.
Four-story self-storage and truck rental facility completed in Saddle Brook, NJ
Why This Partnership Works
This partnership works because each side brought something different to the table, and both mattered.
Faropoint brought market intelligence and institutional capital behind the opportunity. We brought execution capability, knowledge of local approval processes, established relationships with the teams who can deliver, and decades of experience in the New Jersey market.
Good partnerships aren’t about doing the same exact thing. They work when each side brings the right strengths, and that is exactly what happened here.
Project Gallery
Faropoint
Nearing Completion
Conclusion
As Joyce Kilmer Logistics Center approaches completion in November 2026, the project represents more than the addition of 195,421 SF of Class-A industrial space to New Brunswick. It reflects the value of combining local market knowledge, strategic planning, and hands-on development experience to bring a complex project from initial opportunity to final delivery.
Joyce Kilmer Logistics Center demostrates Deugen’s ability to identify compelling development opportunities, navigate complex approvals, and execute alongside institutional capital partners.
Planning an industrial development in New Jersey? Explore a Development Partnership